All Blog Posts

Start of construction work on renewal of Waldstrasse

22.06.2020
  • Aktuelles

For a long time it was planned, now it is time! We are very happy: The construction of the Waldstraße between the Neuwiesenweg and our school begins. In coordination with the city of Steinbach we would like to inform you about the next steps:

- First of all, the new walkway will be built parallel to the existing one.
- With the beginning of the summer holidays (06.07.2020) the Waldstraße behind the parking lot at the fitness center will be completely closed. Access to the school is now only permitted for suppliers and emergency services.
- A "Kiss&Fly" - parents' stop will be signposted in the area of the fitness centre / Altkönighalle car park. Please let your children get on and off the bus quickly. This parents' stop will remain in place even after the construction work is completed.
- Only the fitness centre / Altkönighalle car park is available during construction work.
- Parents who want to take their younger children to school must park there and walk from there. Pedestrians and cyclists will have unhindered access. The path leads through the sports facility.
- In the direction of Steinbach, pedestrians walk from the Altkönighalle in the direction of Feldbergstraße.
- The Phorms school bus and public buses (91, 251) will also stop at the fitness centre / Altkönighalle.
- The construction work is expected to be completed by the autumn holidays.

Please pay attention to the respective signposting. During construction, there may be temporary deviations in the traffic routing in the lower area of the Waldstraße.